The distance between ribs is 2,70 m. and the spans are 13 m long, for fire resistance 120, concrete consumption is 0,17 m3 / m2, competing with wood solutions in terms of sustainability.
System designed in collaboration with BIS for Batlle i Roig projects with large spans ranging from 12m to 15m (up to 20 post-tensioning).
This project has been possible thanks to our invaluable collaborators
Responsible: HOLEDECK
Purpose: respond to your request, as well as possible commercial shipments
Legitimation: thanks to your consent
Recipients: your data is hosted on Siteground.
Your Rights: Access, Rectification, Limitation or Deletion of your data