This project stands out for the use of prefabricated solutions in reinforced concrete. Carried out by the Sacyr construction company, it was resolved with 2,70m precast slabs. which were placed between HOLEDECK beams and cast in situ. The formwork has been made on a continuous board to increase the comfort of the workers.
H-ONE is a perfect solution to be prefabricated or semi-prefabricated. On-site industrialized solutions are a good way to avoid the difficult transport of precast beams. In this case, the beams have been placed at ground level to increase speed and safety during assembly. And then they have been placed in the building to proceed with its concreting.
The time per plant is reduced thanks to the fact that it is only necessary to set the part of the concrete that has been poured in situ.
This project has been possible thanks to our invaluable collaborators
Responsible: HOLEDECK
Purpose: respond to your request, as well as possible commercial shipments
Legitimation: thanks to your consent
Recipients: your data is hosted on Siteground.
Your Rights: Access, Rectification, Limitation or Deletion of your data